Foster Martin Final Phase Coming Along

  • foster martin white rock high rise

Construction Progress Update:
 Level 19: Concrete suspended slab poured
 Level 8: Window wall installation complete
 Level 5: Interior steel stud installation in progress, preparing for unit demising walls

1,256 sq. ft. of elegantly designed interior space + a 320 sq. ft. wrap-around patio with breathtaking ocean views and Natural gas connection for BBQs or Heaters.

 Premium Miele kitchen appliance package – including an integrated 48" side-by-side fridge and freezer
 Thoughtful integrated pantry for seamless kitchen organization
 Ensuite luxury – in-floor radiant heating and a vanity cabinet behind mirrors for extra storage
 Wrap-around floor-to-ceiling windows in the living room and kitchen, maximizing natural light and stunning views

See Tower One and Two Foster Martin listing here. Contact us for availability on Tower Three.

Ped Naimi
(778) 949-7624

 

Quick Search